Eight apps compared on what they actually do, what they cost in 2026, and who each one is right for. Timemark comes first, and the page says plainly when one of the others is the better buy.

Quick answer
Timemark is the top pick for contractors who need every job site photo to show verifiable network time, GPS location, and coordinates without paying for a full project management platform. CompanyCam is a strong runner-up for established contractors who need client-facing project feeds, checklists, and CRM integrations. Fieldwire is the better choice for commercial teams that manage work from drawings, while busybusy fits crews whose main need is GPS time tracking, job costing, and payroll support.
The short list
- Timemark — Verifiable time, GPS, and coordinate-stamped job photos for field crews. Starts at Free.
- CompanyCam — All-round photo workflow, client communication, and contractor integrations. Starts at $63 per month billed annually.
- Fieldwire — Drawing-based tasks, punch lists, and commercial field coordination. Starts at Free.
- SiteCam — Photo documentation with floor plan and map pinning. Starts at Free.
- busybusy — GPS time tracking, payroll support, job costing, and job photos. Starts at Free.
- Raken — Formal daily reports, production tracking, and field reporting. Starts at pricing quoted by sales.
- OpenSpace — 360 job site capture and visual progress comparisons. Starts at pricing quoted by sales.
- Procore — Enterprise construction management with photos as one module. Starts at pricing quoted by sales.
What makes a job photo a job record
A photo sitting in a shared folder carries an upload date and nothing else. A Timemark photo carries the capture time, the street address and the coordinates on the image itself, and the original stays checkable at verify.timemark.com.
- Network time, so changing the phone clock changes nothing
- Street address and coordinates in DMS, DD or UTM
- The original server-side record can be checked at any time

1. Timemark — best for verifiable time and location proof on a budget
Timemark is a job site photo app for contractors who need to show when and where work happened. It stamps network time, GPS location, and coordinates directly onto every photo as it is taken. Roofing, restoration, HVAC, plumbing, electrical, landscaping, and general contracting crews can use it for daily proof, progress records, and photo-backed clock punches.
What it does best
- Stamps network time, GPS location, and coordinates onto every photo as it is taken, so changing the phone clock does not change the stamp.
- Collects the whole team's photos in Teamspace and sorts them by person, project, and date without anyone filing them by hand.
- Exports a job record as a PDF, Excel, ZIP, or KMZ report.
- Records Clock In, Start Break, End Break, and Clock Out with a photo, time, and GPS on each punch, then exports a timesheet.
- Works without signal and syncs photos when the device reconnects.
- Lets anyone check the original server-side record at verify.timemark.com or in the app.
Where it falls short
- It does not pin photos or tasks to drawings or floor plans.
- It does not offer 360 capture or automatic whole-site progress mapping.
- It does not include built-in CRM, estimating, invoicing, or scheduling tools.
- The free Teamspace tier is limited to 100 photos and 3 projects, so a crew will need the Business plan.
- It is a photo documentation tool, not a full project management platform.
Pricing
- Free tier with Teamspace limited to 100 photos and 3 projects.
- Business $7 per user per month, or $60 per user per year billed annually. A crew that shares photos in Teamspace needs the Business plan, which raises Teamspace to 300,000 photos, unlimited projects, central team billing and SharePoint and Google Drive integration.
- An Enterprise tier is listed as coming soon.
Choose Timemark if you need low-cost job photos with network time, GPS, coordinates, team organization, exports, and a record that can be checked at verify.timemark.com.
2. CompanyCam — best for an established all-round job site photo platform
CompanyCam is a broad photo and workflow platform used heavily by roofing, restoration, and exterior contractors in the United States. It gives teams a shared project feed, photo capture, annotations, checklists, daily logs, signatures, and client access. It is built for companies that want photos to support sales, customer communication, operations, and marketing.
What it does best
- Provides a live project feed that office staff, field teams, and clients can follow.
- Offers annotations, before-and-after views, checklists, daily logs, signatures, and guest access.
- Connects with a large list of contractor CRMs and other business tools.
- Includes a marketing suite add-on for social posts and Google review requests.
- Has strong name recognition among US subcontractors and established contractors.
Where it falls short
- It has no free tier, only a free trial.
- Core starts at $63 per month billed annually, which can be a larger spend for a solo contractor.
- Its pricing rises as you add users beyond the included seats.
- It is more than a basic proof-of-time-and-location photo tool, which may be unnecessary for crews that only need documentation.
Pricing
- No free tier, free trial only.
- Core $63 per month billed annually ($79 monthly), includes 1 user; additional users $29 each.
- Crew $119 per month includes 3 users.
- Scale $249 per month includes 3 users.
- Enterprise for 50+ users is quoted by sales.
- The old 3-user minimum is gone, and Core now starts at a single user.
Choose CompanyCam if your company needs a mature photo platform with client-facing project updates, CRM integrations, checklists, and marketing tools.
3. Fieldwire — best for tasks pinned to drawings on commercial work
Fieldwire is a construction field management app owned by Hilti. It is built around drawings, sheets, tasks, punch lists, and field coordination. Commercial contractors and specialty trades use it when the plan set is the main place where work needs to be assigned, tracked, and documented.
What it does best
- Lets you pin tasks and photos to exact locations on construction drawings.
- Supports punch lists, task assignment, due dates, and field coordination.
- Compares sheet revisions and helps teams work from current plans.
- Includes custom forms, a BIM viewer, and 360 photos on higher tiers.
- Handles specification and drawing-based workflows better than photo-only tools.
Where it falls short
- The Basic plan is limited to 5 users, 3 projects, and 100 sheets.
- Photo metadata stamps require the Pro tier or above.
- Its drawing and task tools can be more than a small residential crew needs.
Pricing
- Basic free for up to 5 users, 3 projects and 100 sheets.
- Pro $39 per user per month.
- Business $64 per user per month.
- Business Plus $89 per user per month.
- Custom contracts for unlimited users, SSO and API.
Choose Fieldwire if your crews assign work, manage punch lists, and document issues from drawings on commercial or specialty projects.
4. SiteCam — best for pinning photos to a floor plan with a real free tier
SiteCam is a photo documentation app with floor plan and map pinning. It is useful for small teams that need to show the exact spot where a photo was taken on a PDF plan, map, or project layout. The company has UK roots and is used internationally.
What it does best
- Pins photos to exact points on floor plans and maps.
- Adds tags, descriptions, unique photo IDs, and markups.
- Supports before, during, and after documentation.
- Creates report links for sharing job records.
- Offers a usable free tier with unlimited team members and no time limit.
Where it falls short
- The free tier is capped at 500 photos, 25 reports, and 3 projects.
- The free tier limits videos to 1 minute.
- Pro is $29 per user per month, well above the photo-first tools in this list.
- Enterprise requires a minimum of 50 users.
Pricing
- Free at $0 per user per month, capped at 500 photos, 25 reports and 3 projects, with unlimited team members and 1 minute videos.
- Pro $29 per user per month for unlimited photos, reports and projects plus 10 minute videos.
- Enterprise requires a minimum of 50 users and adds SSO, custom roles and an account manager.
Choose SiteCam if your team needs photos pinned to floor plans and wants a free plan that supports unlimited team members.
Hand over a report, not a folder of files
Teamspace collects the whole crew's photos and sorts them by person, project and date. Export the set as a PDF, Excel, ZIP or KMZ file when a client, an insurer or a general contractor asks for it.

5. busybusy — best when photos have to sit next to hours and payroll
busybusy is a GPS time tracking platform that also supports job photos and daily project reporting. It is designed for contractors who need to manage labor hours, equipment, job costs, and payroll processes from the field. Photo documentation is part of a larger workforce management system.
What it does best
- Tracks clock-ins and clock-outs with GPS.
- Supports breadcrumbing, equipment tracking, and job costing.
- Includes digital timecard signatures, overtime rules, and supervisor tools.
- Offers clock-in photo verification and a kiosk punch clock.
- Automates payroll-related workflows and daily project reports.
Where it falls short
- Its main focus is labor tracking rather than photo evidence.
- Photos are attached to time entries and reports rather than being the record itself.
- Pro and Premium plans include a separate $40 admin licence.
- Teams that only need photo documentation may not need its payroll and equipment features.
Pricing
- Free tier with GPS time tracking, job costing, equipment tracking and unlimited users.
- Pro $9.99 per user per month plus a $40 admin licence, first user included.
- Premium $14.99 per user per month plus the same $40 admin licence.
Choose busybusy if your main problem is tracking labor hours, job costs, equipment, and payroll rather than building a photo evidence record.
6. Raken — best for formal daily reports handed to a GC or owner
Raken is a field-first reporting platform for contractors that need organized daily reports from the job site. Crews use it to submit time cards, production details, checklists, observations, and toolbox talks. Office teams use the structured reports to update general contractors, owners, and project leaders.
What it does best
- Produces formal daily reports that are easy to share with a general contractor or owner.
- Combines time cards, production tracking, checklists, and field observations.
- Supports toolbox talks and job site reporting routines.
- Helps compare production progress against budget.
- Gives office teams structured information from field crews.
Where it falls short
- It does not publish pricing, so you need a sales quote before comparing cost.
- Smaller crews with simple photo needs may not need a formal reporting system.
- It does not replace drawing-based task coordination for plan-heavy projects.
Pricing
- Does not publish pricing.
- Quoted by sales.
Choose Raken if you regularly deliver formal daily reports, production updates, and field records to a general contractor or owner.
7. OpenSpace — best for 360 capture and automatic progress comparison
OpenSpace documents a job site through 360 camera walks rather than individual phone photos. The software maps the capture to the floor plan automatically and lets teams compare different site walks over time. It is commonly used on larger commercial and institutional projects.
What it does best
- Captures broad visual coverage of a site through 360 camera walks.
- Maps 360 captures to the floor plan automatically.
- Compares past and current captures side by side to show progress.
- Reduces the need for a worker to decide which individual areas to photograph.
- Supports larger projects where owners, architects, and project teams need a visual record of changing conditions.
Where it falls short
- It needs a 360 camera.
- It does not publish pricing, so you need a sales quote.
- It can be more than a small contractor needs for routine job photos.
Pricing
- Does not publish pricing.
- Quoted by sales.
- Needs a 360 camera.
Choose OpenSpace if you need repeatable 360 site walks and automatic visual progress comparisons across a large commercial or institutional project.
8. Procore — best for enterprise construction management where photos are one module
Procore is a full construction management platform for companies managing complex projects and many stakeholders. Photos are one part of a system that also includes financials, RFIs, submittals, quality and safety, scheduling, and design coordination. It is built for businesses that need one platform across budgets, contracts, compliance, and project delivery.
What it does best
- Brings financials, RFIs, submittals, quality and safety, scheduling, and design coordination into one platform.
- Supports enterprise construction workflows across many projects and teams.
- Gives photos a place inside a larger project record.
- Supports unlimited users on contract.
- Fits companies that need shared processes for budgets, contracts, and compliance.
Where it falls short
- It does not publish pricing, so you need a sales quote.
- It is typically an annual contract sized to the business.
- Its broad platform can be more than a solo contractor or small crew needs.
- Photos are one module rather than the central focus of the product.
Pricing
- Does not publish pricing.
- Quoted by sales, typically an annual contract sized to the business.
- Unlimited users on contract.
Choose Procore if your company needs enterprise construction management for financials, contracts, RFIs, compliance, schedules, and project coordination across many projects.
How to choose
Does the photo record need to support a dispute or claim?
Timemark is the strongest fit when each image needs visible network time, GPS location, and coordinates, plus an original record that can be checked. Its Photo Code lets someone check the original server-side record at verify.timemark.com or in the app. CompanyCam and SiteCam are useful for organized project photos, while busybusy is stronger when the record needs to connect to worker time entries.
Do photos need to sit on a drawing or floor plan?
Fieldwire wins when teams need to pin tasks and photos to construction drawings, manage sheet revisions, and run punch lists. SiteCam is a good fit when a small team mainly wants photo pinning on PDF floor plans or maps. OpenSpace is the choice for automatic mapping of 360 site walks to plans.
Is payroll, labor tracking, or job costing the main problem?
busybusy is the clearest choice for GPS time tracking, job costing, equipment tracking, overtime rules, and payroll workflows. Timemark includes photo-backed Clock In, Start Break, End Break, and Clock Out records, then exports a timesheet. Choose busybusy when labor management is the core need and Timemark when photo proof is the core need.
Do you need formal reports for a GC, owner, or office team?
Raken is built for formal daily reports, production tracking, time cards, observations, and toolbox talks. CompanyCam also supports daily logs, checklists, signatures, and client access for contractor operations. Timemark exports PDF, Excel, ZIP, and KMZ files when you need to send organized photo records without adopting a full reporting platform.
How large and complex is the company?
Timemark, SiteCam, and busybusy can fit solo contractors and small crews that need practical field tools. CompanyCam fits established contracting companies that want client communication, integrations, and shared project activity. Procore and OpenSpace fit larger organizations with more complex projects, stakeholders, and reporting needs.
What is the monthly budget?
Timemark starts with a free tier, and a crew that shares photos in Teamspace needs the Business plan at $7 per user per month, or $60 per user per year billed annually. SiteCam offers a $0 per user per month free plan, while Fieldwire Basic is free for up to 5 users, 3 projects and 100 sheets. CompanyCam starts at $63 per month billed annually, and Raken, OpenSpace, and Procore require sales quotes.
One template, the same fields from every crew
Set the fields once and every photo carries the same project name, work description, area, time and location. That consistency is what makes a photo set searchable a year later.

Frequently asked questions
See what a verifiable job photo looks like
Take one photo with Timemark and check it yourself at verify.timemark.com.
Start for free